Ask these in writing and keep the answers. If you are managing from abroad, the written record is the only version of the conversation that will still exist in nine months, and comparing two contractors' written answers side by side is more revealing than comparing their totals.
Standing, licensing, and insurance
- May I see a current DURC for your company? Why it matters: the DURC certifies the firm is up to date on social security and insurance contributions for its workers. An expired one signals cash flow trouble, and a firm without one can create problems for your filings.
- May I see your visura camerale? Why it matters: the registry extract shows how long the company has existed, what activities it is registered for, who can legally sign, and whether it is in liquidation. It takes minutes to read and occasionally ends the conversation.
- What is your partita IVA, and will every payment be invoiced? Why it matters: no VAT number means no proper invoice, no deductible cost, no warranty trail, and no legal recourse worth having.
- What insurance do you carry, and can I see the certificates? Why it matters: you want civil liability cover for damage to third parties and, on a substantial job, an all risks policy covering the works themselves. Verbal reassurance is not cover.
- Are your workers your employees, and are they registered with the construction workers fund? Why it matters: undeclared labor on your site exposes you to liability and usually indicates a price that cannot actually be delivered legally.
- Have you worked on buildings like this one before, in this comune? Why it matters: an old masonry house and a 1970s apartment are different trades. Local experience also means the firm knows the technical office and the local suppliers.
- Can you give me two references from jobs finished more than a year ago? Why it matters: recent clients are still polite. Clients from two years ago know whether the work held and whether the firm came back to fix anything.
Scope and specification
- Will you provide a computo metrico estimativo with quantities and unit prices? Why it matters: it is the only version of a quote you can audit, compare, and use to check progress claims.
- What exactly is excluded from your price? Why it matters: scaffolding, waste disposal, professional fees, VAT, utility connections, and the supply of finishes are commonly out. The exclusions decide the budget.
- For each finish, is it fornitura e posa or solo posa? Why it matters: supply and install means it is your contractor's problem if the material is wrong, late, or damaged. Install only means it is yours.
- Which brands and models are you pricing, by name? Why it matters: equivalent is not a specification. Naming the boiler, the tile, the window system, and the plaster is how you prevent a quiet substitution.
- What do you expect to find behind these walls, and how will we price it if you are right? Why it matters: an experienced firm has an opinion about a building. Agreeing unit rates for probable unknowns in advance avoids negotiating under pressure later.
- Who supplies and coordinates the windows? Why it matters: serramenti are usually the longest lead item and the most common cause of a stalled finishing sequence. Somebody has to own the measurement and the date.
Timeline and site management
- What is the start date, and what has to happen before it? Why it matters: a start date conditional on a permit you do not yet have is not a date. Write down the preconditions.
- What is the sequence, phase by phase, with durations? Why it matters: you cannot judge whether the job is late unless you agreed what on time looks like at each stage.
- How many of your people will be on this site, and will they be here continuously? Why it matters: small firms run several jobs at once. The honest answer is often that the crew rotates, which is fine if it is planned and disastrous if it is denied.
- How does August affect our schedule? Why it matters: much of Italian construction and most suppliers slow or close for weeks in August. It belongs in the plan, not in an apology.
- Who is the capocantiere, and can I have their name and number? Why it matters: the person who actually answers on site is rarely the person who sold you the job.
Money and payments
- What deposit do you need, and what specifically does it fund? Why it matters: a deposit tied to named material orders is reasonable. A deposit that is simply a share of the contract is you financing the firm.
- Can we tie payments to measured progress stages rather than dates? Why it matters: a calendar based schedule pays for time. A stage based schedule pays for work, which is the thing you want.
- Will you accept a retainage released after the punch list and the certificates? Why it matters: it is the only leverage that survives to the end of the job, which is exactly when you need leverage.
- How will you invoice, and at what VAT rate for each part of the work? Why it matters: the rate depends on the classification and on who supplies what. You want it settled before the first invoice, not argued afterward.
- If I claim an Italian tax deduction, are you set up to support the documentation? Why it matters: the payment references and invoice wording have to be right at the time of payment. It cannot be corrected retroactively.
- How will you price variations? Why it matters: agreeing that variations use the original unit price basis, in writing, removes the single largest source of renovation disputes.
Subcontractors and coordination
- Which trades will you subcontract, and to whom? Why it matters: you are entitled to know who is on your site. It also tells you whether the plumbing and electrical are core competence or an afterthought.
- Do your subcontractors carry their own insurance and contribution compliance? Why it matters: the same standards you applied to the main firm should apply down the chain, because the risk does not stop at the contract.
- Who coordinates between trades, and what happens when two of them disagree? Why it matters: on a renovation the expensive failures are almost always at handoffs, particularly between the plumber, the electrician, and the tiler.
- Will there be more than one company on site at the same time? Why it matters: the answer determines whether the safety coordination framework and its plans and notifications are required. Your geometra will confirm, but the contractor should raise it.
Communication, since you will not be there
- How will you send me progress updates, how often, and in what form? Why it matters: agree the rhythm at the start. Weekly, written, with photographs, is a reasonable ask and costs the firm ten minutes.
- Will you attach photographs to the specific item they document? Why it matters: fifty photos in a chat thread is not a record. Photographs attached to the checklist item they belong to are evidence you can find two years later.
- Who on your team can write to me in English, or how do you want to handle the language difference? Why it matters: pretending there is no language gap is how instructions get lost. Naming the mechanism, whether a bilingual contact or a shared tool that translates both directions, makes it somebody's job.
- How quickly will you answer a written question, and what do you do if you need a decision urgently? Why it matters: with six or more hours of time difference, an unanswered question can cost a full working day. Agree a rule for what happens when you are asleep.
- Will you and your trades use the project checklist I set up? Why it matters: one shared list beats parallel lists in two languages. This is the concrete thing MonthlyAlerts does, and the value is entirely in everyone actually working from the same record.
Warranty and defects
- What is your position on the ten year liability for serious defects? Why it matters: Italian law gives you a long liability for grave defects affecting the building's stability or essential parts, and a much shorter window for ordinary defects, with a short notice period once you discover one. Know both clocks.
- Is there an insurance policy behind that warranty, or only your company? Why it matters: a statutory liability against a firm that has dissolved is worth nothing. Where an insured warranty is available, ask what it covers and who the beneficiary is.
- What is the process if I find a defect after handover, and how fast will you return? Why it matters: for a remote owner the practical question is not liability, it is response time. Get a commitment in the contract.
- What manufacturer warranties come with the boiler, the windows, and the fixtures, and who registers them? Why it matters: several require registration or commissioning by an authorized installer to be valid, and nobody does it unless it is assigned.
Cleanup, permits, and closeout
- Who handles the permit filings, and are the professional fees in your price? Why it matters: contractors sometimes include the technician and sometimes assume you have your own. Both are fine. Unclear is not.
- Who is responsible for waste removal, and can you show the disposal documentation? Why it matters: construction waste is legally tracked in Italy. Dumping it is the owner's problem too, and the paperwork is cheap insurance.
- Is final cleaning included, and to what standard? Why it matters: builders' clean and habitable are different things, and the gap is a real cost when you are arriving from an airport with luggage.
- Which certificates will you hand over, and when? Why it matters: list them explicitly. Electrical conformity, gas conformity, structural sign off where applicable, product declarations, and the pressure test report. Attach the final payment to the list.
- Will you walk the punch list with my direttore dei lavori and sign it? Why it matters: a signed defects list dated at handover is the document that decides every later argument about whether something was damage or workmanship.
One last thing that is not a question. Watch how the firm behaves between the meeting and the contract. Do they send the quote when they said they would, answer the follow up email, and correct the thing you pointed out? A renovation is twelve months of exactly that behavior, repeated. The sample you get before signing is representative, and it is free.
Questions people ask
- How many contractors should I get quotes from?
- Three is the sensible number, and all three should be pricing the same document. In a small comune you may only find two firms willing to bid, particularly if you are foreign and remote, in which case invest more in the specification and in checking the firm rather than in shopping the price.
- Should I use the contractor my geometra recommends?
- Often yes. A technician who files in the comune every week knows which firms finish and which do not, and a builder who has worked with your supervisor before argues less. What you should ask for is disclosure of any commercial relationship between them, and you should still get competing quotes so the recommendation is tested rather than assumed.
- Is a signed preventivo enough of a contract?
- It is often treated as one, which is exactly why you should not sign a thin one. If you sign a quote, assume a court would read it as the contract. Better is a short contratto d'appalto that names the parties, the price basis, the payment stages, the completion date, the variation procedure, and attaches the computo and the capitolato as annexes.
- What should I do if the work stalls and the contractor stops answering?
- Move immediately from informal channels to written notice, sent by your geometra or a lawyer, describing the delay and setting a deadline to resume. Do not release further payments. This is the moment when a dated record of instructions, approvals, invoices, and photographs stops being administrative diligence and becomes your entire position, so keep that record from day one rather than assembling it in a crisis.
Start with a checklist
Related guides
Renovating in Italy
Understanding Italian Renovation Estimates
Preventivo versus computo metrico, regional unit prices, IVA rates, the exclusions that blow budgets, payment stages, and how to compare two Italian quotes fairly.
Renovating in Italy
What Is a Geometra, and Do You Need One?
A geometra files your permits, updates the cadastre, and supervises the works. What the role covers, how it differs from an architetto, and what to ask before you hire.
Renovating in Italy
How to Manage a Renovation in Italy from the United States
A practical playbook for running an Italian renovation remotely: who to hire, which permit you need, how payments and IVA work, and what to check every month.
Renovating in Italy
Italian Construction Terminology for English Speakers
Over 80 Italian building terms grouped by category, with English meanings and notes on what each one signals when it shows up in a quote or an email.
Published September 8, 2026. This guide is general information, not legal, engineering, or tax advice. Rules change; confirm anything that matters with a licensed professional in the jurisdiction of the property.