Guides

Renovation guides for projects that cross a language.

Written for owners and contractors who run real projects: what to track, what to ask, and what goes wrong when the crew, the architect, and the client don't share a language.

Renovating in Italy

Multilingual job sites

Managing a renovation remotely

Remodeling

Checklist templates

10 phases · 76 items

Kitchen Renovation

A kitchen renovation runs through the same ten phases almost every time, and most problems come from doing one of them out of order. This checklist follows the work from the first measurements to the final walkthrough, with the dimensions and code items that are easy to miss until the walls are closed. Use it as the shared list for you, your contractor and every trade on the job.

9 phases · 70 items

Bathroom Remodel

A bathroom is the smallest room in a renovation and the one with the most ways to go wrong, because water, ventilation and clearances all have to be right before the tile goes on. This checklist covers the whole job with the clearances, rough-in heights and waterproofing steps written into the items. Work through it in order and the expensive mistakes get caught while they are still cheap.

12 phases · 93 items

Whole-House Renovation

A whole-house renovation is a dozen small projects that have to happen in the right order, and the cost of getting the order wrong grows with every phase. This checklist runs from the first budget conversation to the twelve month review, at the level of detail a homeowner and a general contractor would actually track together. It is written to be edited: keep the phases your project has and delete the rest.

7 phases · 64 items

Punch List / Final Walkthrough

A punch list only works if everyone is looking at the same list, in a room by room order, with each line written as a check that can pass or fail. This template covers the items that come up on most final walkthroughs, from the exterior to the closeout paperwork. Take it on site, mark what fails, add a photo to each failure, and assign it.

9 phases · 78 items

Renovation in Italy

Renovating in Italy follows a documented sequence, and most of the difficulty for a foreign owner is knowing which document belongs to which phase. This checklist lays out the phases from purchase due diligence to agibilità, using the Italian terms your geometra and impresa will actually use, with the English meaning next to each one. The paperwork items matter as much as the building items, because a missing declaration can block a utility contract or a future sale.

9 phases · 69 items

Overseas Renovation

Renovating a property in another country is mostly a problem of information: you cannot see the site, the rules are local, and every question crosses a time zone. This checklist is country neutral and built around the three things that keep a remote project under control, which are due diligence before you commit, a fixed reporting rhythm, and payments released only against verified milestones. Use it alongside whatever local process your technical lead follows.

Pricing

$100per project

One project. One payment. Not a subscription.

Build your checklist free, preview it in every language, then activate for a one-time fee to invite your team and start monthly reports.

Free for everyone you invite

Start a project