Punch List / Final Walkthrough checklist

A punch list only works if everyone is looking at the same list, in a room by room order, with each line written as a check that can pass or fail. This template covers the items that come up on most final walkthroughs, from the exterior to the closeout paperwork. Take it on site, mark what fails, add a photo to each failure, and assign it.

Start a project from this template7 phases · 64 items · free to build, translated for every member

01Exterior

  • Siding, render and trim are complete with no gaps or unpainted edges

  • Exterior paint covers evenly with no drips or overspray on glass and hardware

  • Gutters and downpipes are fixed, sloped, and discharge away from the foundation

  • Exterior doors close and latch without rubbing, and the weatherstripping seals

  • Windows open, close and lock, and the screens are fitted

  • Exterior sealant is continuous at windows, doors and all penetrations

  • Exterior lights and receptacles work, and the receptacle covers are weather rated

  • Walkways, steps and railings are secure and free of trip hazards

  • The site is clear of debris and the grading and landscaping are restored

02Entry and living areas

  • Doors close and latch without rubbing

  • Door hardware is aligned, tight, and set at a consistent height

  • Floors are free of squeaks, gaps, scratches and lifted edges

  • Transitions and thresholds are secure and flush

  • Trim and skirting joints are filled, sanded and painted

  • Walls are free of nail pops, visible tape lines, roller marks and patch shadows

  • Ceilings are free of cracks and stains, and light fittings are centered and level

  • Switches, receptacles and cover plates are level, tight and working

  • Windows lock, the glass is clean, and all labels are removed

03Kitchen

  • Cabinet doors and drawers align, close fully, and clear each other

  • Drawer and door hardware is straight, tight and consistent

  • Countertop seams are tight, flush and color matched

  • Sink cutout edges are finished and the sink is sealed to the counter

  • Faucet and sprayer work with no leak under the sink

  • Dishwasher is level, secured, and drains with no leak after a full cycle

  • Range hood runs at every speed, the light works, and the duct exhausts outside

  • Range and refrigerator sit level with even gaps to the cabinets

  • GFCI receptacles trip and reset, and the under cabinet lighting works

  • Backsplash grout and sealant are complete and clean

04Bathrooms

  • Toilet is secure, does not rock, and refills without running on

  • Vanity is level and fixed to the wall, with the top sealed at the wall

  • Faucet and drain work with no leak inside the cabinet

  • Hot and cold are on the correct sides at every fixture

  • Shower drains fully with no standing water left on the floor

  • Shower door closes, seals, and does not drip outside the enclosure

  • Tile is flat, grout is complete, and changes of plane are sealed with flexible sealant

  • Exhaust fan holds a sheet of tissue to the grille and vents to the outside

  • Mirror, accessories and grab bars are fixed into blocking

  • GFCI protection works at every receptacle

05Bedrooms

  • Doors close, latch, and clear the finished floor

  • Closet doors, tracks and shelving run smoothly and are secure

  • Walls and ceilings are free of visible patches and roller marks

  • Floors are level and free of gaps at the walls and transitions

  • Every receptacle, switch and ceiling fitting works

  • Windows open, lock, and have working locks and fitted screens

  • Smoke alarm is installed, powered and tested

  • Registers and grilles are fitted and airflow reaches the room

06Mechanical and utility

  • Heating and cooling reach the set temperature in every room

  • Filters are new and accessible, and the filter size is recorded

  • Water heater is supported, vented, and set to the specified temperature

  • No leaks at the water heater, shutoffs, hose bibs or any visible pipe

  • Electrical panel is clearly labeled and the cover is fitted

  • No circuit trips under normal load

  • Dryer vent runs to the outside with no crushed sections

  • Sump pump, floor drains and any backflow device operate

  • Attic and crawl space insulation is complete and access hatches are sealed

07Paperwork and closeout

  • All permits are closed and every final inspection has passed

  • Completion or occupancy certificate is issued and filed

  • Warranties, manuals and equipment serial numbers are collected

  • As built drawings and pre-drywall photographs are handed over

  • Lien releases are signed by the contractor and every subcontractor

  • Paint, tile and flooring product names and batch numbers are recorded

  • Spare materials are labeled and stored

  • Keys, remotes, access codes and alarm codes are handed over

  • Every open punch list item has an agreed completion date before final payment

Who uses this checklist

  • General contractors
  • Subcontractors
  • Site supervisors
  • Homeowners
  • Property managers
  • Inspectors
  • Architects

Questions people ask

When should the punch list be created?
Walk the project when the work is substantially complete but before the crew leaves, and write the list on site with the contractor present. A list written after everyone has moved to the next job turns into a negotiation instead of a task list.
How should a punch list item be written?
As a single check that either passes or fails, in one sentence, naming the room and the location. Compare "Doors close and latch without rubbing" with "door problem": only the first tells a carpenter what to do and lets anyone confirm it is done.
How much should be held back until the punch list is clear?
That depends on the contract, but the retained amount has to be large enough that finishing the list is worth more to the contractor than walking away from it. Agree the figure and the completion date in the contract rather than at the walkthrough.
Does everyone need to read the list in the same language?
No, and that is the point of this template. The list is written once and each person sees it in their own language, along with the comments and photos, so a bilingual job does not need two separate lists that drift apart.

Read before you start

Other templates

Pricing

$100per project

One project. One payment. Not a subscription.

Start from this template free. Activate for a one-time fee when you're ready to invite your team, start monthly reports, and keep the project for two years.

Free for everyone you invite

Start a project
Punch List Template for Contractors — MonthlyAlerts