A kitchen renovation runs through the same ten phases almost every time, and most problems come from doing one of them out of order. This checklist follows the work from the first measurements to the final walkthrough, with the dimensions and code items that are easy to miss until the walls are closed. Use it as the shared list for you, your contractor and every trade on the job.
01Planning and design
Measure the existing kitchen and record every dimension
Record wall lengths, window and door positions, ceiling height, and the location of any structural column or chase.
Confirm appliance sizes before the layout is final
Cabinet openings are built to the appliance specification sheet, so choose the models before anything is ordered.
Decide whether any wall will be removed
Removing a load bearing wall needs a structural engineer and a beam, which changes the budget, the permit and the schedule.
Plan at least 15 inches of counter landing space beside the range
Most codes require a landing area next to a cooking surface so hot pans have somewhere to go.
Set the distances between sink, range and refrigerator
Keep each leg of the work triangle between 4 and 9 feet so two people can work without crossing paths.
Choose the sink, faucet and range hood before rough-in
Drain, supply and duct positions all depend on these models, so confirm them early even if delivery is later.
Set the budget with a contingency of 10 to 15 percent
Older kitchens hide failed plumbing, old wiring and water damage that only appear after demolition.
Agree the written scope and allowances with the contractor
List which materials the contractor supplies and which you supply, with a price allowance for every undecided item.
02Permits and approvals
Confirm which permits the work needs
Most kitchen work needs plumbing and electrical permits, and moving walls or windows needs a building permit.
Submit the drawings to the building department
Get building or homeowners association approval
Buildings often restrict work hours, elevator use, and any change to shared plumbing risers.
Confirm the contractor license and insurance are current
Schedule the inspection sequence with the building department
Rough-in inspections have to pass before the walls are closed, so book them into the schedule now.
Post the permit on site and keep the approved drawings there
03Demolition
Shut off water, gas and power to the work area
Cap the lines and label every shutoff so nobody restores a service by accident.
Test for asbestos and lead before disturbing old finishes
Homes built before 1980 may have asbestos in floor tile and lead in paint, and both need trained removal.
Protect floors, doorways and adjacent rooms
Use dust barriers with zippers at doorways and cover any flooring that will remain.
Set up a temporary kitchen
Move the refrigerator, a microwave and a kettle to another room before the sink comes out.
Remove cabinets, countertops and appliances
Open walls only where the scope requires
Inspect the exposed framing for rot, water damage and old wiring
Price any repair found here as a change before the trades start their rough-in.
04Rough-in plumbing
Set the sink drain and supply locations from the cabinet drawings
Confirm the drain slope
Horizontal drain lines need a fall of about one quarter inch per foot toward the stack.
Install the vent for the sink drain
Every trap needs a vent, and an island sink usually needs a loop vent or an air admittance valve where local code allows one.
Run the refrigerator water line with its own shutoff valve
Place the valve where it can be reached without pulling the refrigerator out.
Rough in the dishwasher supply, drain and air gap
Add a shutoff valve for every fixture
Pressure test the new lines before the walls close
A leak found under pressure now costs nothing compared with one found behind finished tile.
Book and pass the plumbing rough-in inspection
05Rough-in electrical
Plan the small appliance circuits
Kitchen counter receptacles normally need at least two dedicated 20 amp circuits.
Provide GFCI protection for receptacles within 6 feet of the sink
Most codes now require GFCI protection on all kitchen counter receptacles, and always on those near water.
Space counter receptacles so no point is more than 24 inches from one
Measured along the counter, this usually means a receptacle every 4 feet.
Run dedicated circuits for the range, oven, dishwasher, disposal and microwave
Rough in the range hood circuit and its duct in the same trip
Plan lighting in layers
Include ceiling lights, under cabinet task lighting, and a separately switched circuit for island pendants.
Set switch and receptacle heights against the finished backsplash
Mark the finished counter and backsplash heights on the studs so no outlet lands on a tile edge.
Label the panel, then book and pass the electrical rough-in inspection
06Walls and ceiling
Insulate exterior walls and air seal every penetration
Photograph every open wall before drywall
Take pictures showing pipe and wire locations and keep them with the project records.
Add blocking for wall cabinets, shelves and the range hood
Screwing into blocking rather than drywall anchors is what keeps loaded upper cabinets on the wall.
Install a water resistant panel behind the sink wall
Hang, tape and sand the drywall
Check walls for plumb and corners for square before cabinet layout
Out of square corners change the filler sizes, and it is cheaper to know before the cabinets arrive.
Prime and paint the ceiling and walls before cabinets go in
07Flooring
Check the subfloor for level and stiffness
Tile needs a flat and stiff subfloor, so correct dips and add support before setting anything.
Decide whether the flooring runs under the cabinets
Running the floor through simplifies future changes, and stopping at the cabinets saves material.
Confirm the finished floor height at every doorway and transition
Install the underlayment or membrane the flooring manufacturer specifies
Set the flooring and allow the full cure time before loading it
Cabinets and appliances rolled over uncured tile break the bond and crack grout later.
Protect the finished floor during cabinet and appliance installation
Install thresholds and base moulding
08Cabinets and countertops
Check the cabinet delivery against the order list
Inspect every box for damage and correct size on the day it arrives, while a claim is still simple.
Find the high point of the floor and set a level layout line
Install the wall cabinets before the base cabinets
Set the base cabinets level and shim them to the layout line
Confirm the counter height and overhang
A standard counter is about 36 inches high with a 1 inch overhang past the cabinet face.
Template the countertop only after the base cabinets are fixed
Stone fabricators measure the installed cabinets, not the drawings, so nothing can move afterwards.
Confirm the sink and cooktop cutouts on the template
Check the cutout positions and the faucet hole count against the actual fixtures before the stone is cut.
Install the countertop, then seal the stone if the material needs it
Fit the backsplash after the countertop is in place
09Appliances and fixtures
Confirm the range hood airflow
Size the hood to the cooking surface, commonly about 100 CFM per linear foot for a wall hood and more for an island hood.
Vent the hood to the outside with rigid duct
Rigid metal duct with few bends keeps the rated airflow, and flexible duct reduces it.
Provide make-up air where the hood exceeds 400 CFM
A large hood can depressurize a tight house, and many codes require a make-up air supply above this level.
Install the sink, faucet and disposal and check for leaks
Connect the dishwasher with a high loop or an air gap
Install the range, oven and refrigerator and check clearances to the cabinets
Run every appliance through a full cycle
Test the oven at temperature, the dishwasher on a full wash, and the ice maker after a day.
Register the warranties and file the manuals with the project
10Final walkthrough
Walk the kitchen with the contractor and write one shared punch list
Open and close every door and drawer
Check alignment, soft close operation, and that nothing rubs the neighboring door.
Test every outlet, switch and light, including the GFCI test buttons
Check under the sink and around the dishwasher for leaks after a full cycle
Check caulk, grout and paint touch ups in daylight
Defects that hide under work lights are obvious in the morning, so look at the room twice.
Confirm all inspections passed and collect the final sign off
Collect lien releases, warranties and the final invoice
Agree a completion date for every punch list item before the final payment
The remaining payment is the only leverage left once the crew has moved to the next job.
Who uses this checklist
- Homeowners
- General contractors
- Kitchen designers
- Remodeling crews
- Project managers
- Cabinet installers
- Owners renovating remotely
Questions people ask
- How long does a kitchen renovation take?
- A kitchen with no structural change usually runs 6 to 10 weeks on site, plus 4 to 12 weeks beforehand for design, permits and cabinet lead time. Countertop fabrication adds 1 to 3 weeks after the cabinets are installed, because the template can only be taken once they are fixed in place.
- What order should the work follow?
- Demolition, then structural changes, then rough-in plumbing and electrical, then inspections, then insulation and drywall, then paint, then flooring, then cabinets, then countertop template and installation, then backsplash, then appliances and fixtures. The rough-in inspections are the gate: nothing gets closed up until they pass.
- Which items are most often missed?
- Blocking for the upper cabinets and the range hood, the make-up air requirement for a large hood, the refrigerator water line shutoff in a reachable position, and photographs of the open walls before drywall. All four are cheap during rough-in and expensive afterwards.
- Can I use this checklist with a contractor who does not speak my language?
- Yes. Items are written once in English and each person sees them in their own language, so the same list works for you, the contractor and every trade. Comments and photos are translated the same way.
Read before you start
Remodeling
12 Things Homeowners Forget During a Kitchen Renovation
Outlet placement, appliance clearances, cabinet lead times, permits, ventilation, dust protection, and eight more kitchen renovation details that get missed.
Renovating in Italy
Italian Kitchen and Bathroom Renovation Checklist
A phase by phase checklist for Italian kitchens and bathrooms: demolition, rough-in, screed and waterproofing, tiling, fixtures, 60cm modules, bidets, hood venting, handover.
Remodeling
How to Write a Contractor Punch List
A room-by-room method for the final walkthrough, how to describe defects so they actually get fixed, US retainage norms, and how to sign off cleanly.
Other templates
9 phases · 70 items
Bathroom Remodel
A bathroom is the smallest room in a renovation and the one with the most ways to go wrong, because water, ventilation and clearances all have to be right before the tile goes on. This checklist covers the whole job with the clearances, rough-in heights and waterproofing steps written into the items. Work through it in order and the expensive mistakes get caught while they are still cheap.
12 phases · 93 items
Whole-House Renovation
A whole-house renovation is a dozen small projects that have to happen in the right order, and the cost of getting the order wrong grows with every phase. This checklist runs from the first budget conversation to the twelve month review, at the level of detail a homeowner and a general contractor would actually track together. It is written to be edited: keep the phases your project has and delete the rest.
7 phases · 64 items
Punch List / Final Walkthrough
A punch list only works if everyone is looking at the same list, in a room by room order, with each line written as a check that can pass or fail. This template covers the items that come up on most final walkthroughs, from the exterior to the closeout paperwork. Take it on site, mark what fails, add a photo to each failure, and assign it.