Kitchen Renovation checklist

A kitchen renovation runs through the same ten phases almost every time, and most problems come from doing one of them out of order. This checklist follows the work from the first measurements to the final walkthrough, with the dimensions and code items that are easy to miss until the walls are closed. Use it as the shared list for you, your contractor and every trade on the job.

Start a project from this template10 phases · 76 items · free to build, translated for every member

01Planning and design

  • Measure the existing kitchen and record every dimension

    Record wall lengths, window and door positions, ceiling height, and the location of any structural column or chase.

  • Confirm appliance sizes before the layout is final

    Cabinet openings are built to the appliance specification sheet, so choose the models before anything is ordered.

  • Decide whether any wall will be removed

    Removing a load bearing wall needs a structural engineer and a beam, which changes the budget, the permit and the schedule.

  • Plan at least 15 inches of counter landing space beside the range

    Most codes require a landing area next to a cooking surface so hot pans have somewhere to go.

  • Set the distances between sink, range and refrigerator

    Keep each leg of the work triangle between 4 and 9 feet so two people can work without crossing paths.

  • Choose the sink, faucet and range hood before rough-in

    Drain, supply and duct positions all depend on these models, so confirm them early even if delivery is later.

  • Set the budget with a contingency of 10 to 15 percent

    Older kitchens hide failed plumbing, old wiring and water damage that only appear after demolition.

  • Agree the written scope and allowances with the contractor

    List which materials the contractor supplies and which you supply, with a price allowance for every undecided item.

02Permits and approvals

  • Confirm which permits the work needs

    Most kitchen work needs plumbing and electrical permits, and moving walls or windows needs a building permit.

  • Submit the drawings to the building department

  • Get building or homeowners association approval

    Buildings often restrict work hours, elevator use, and any change to shared plumbing risers.

  • Confirm the contractor license and insurance are current

  • Schedule the inspection sequence with the building department

    Rough-in inspections have to pass before the walls are closed, so book them into the schedule now.

  • Post the permit on site and keep the approved drawings there

03Demolition

  • Shut off water, gas and power to the work area

    Cap the lines and label every shutoff so nobody restores a service by accident.

  • Test for asbestos and lead before disturbing old finishes

    Homes built before 1980 may have asbestos in floor tile and lead in paint, and both need trained removal.

  • Protect floors, doorways and adjacent rooms

    Use dust barriers with zippers at doorways and cover any flooring that will remain.

  • Set up a temporary kitchen

    Move the refrigerator, a microwave and a kettle to another room before the sink comes out.

  • Remove cabinets, countertops and appliances

  • Open walls only where the scope requires

  • Inspect the exposed framing for rot, water damage and old wiring

    Price any repair found here as a change before the trades start their rough-in.

04Rough-in plumbing

  • Set the sink drain and supply locations from the cabinet drawings

  • Confirm the drain slope

    Horizontal drain lines need a fall of about one quarter inch per foot toward the stack.

  • Install the vent for the sink drain

    Every trap needs a vent, and an island sink usually needs a loop vent or an air admittance valve where local code allows one.

  • Run the refrigerator water line with its own shutoff valve

    Place the valve where it can be reached without pulling the refrigerator out.

  • Rough in the dishwasher supply, drain and air gap

  • Add a shutoff valve for every fixture

  • Pressure test the new lines before the walls close

    A leak found under pressure now costs nothing compared with one found behind finished tile.

  • Book and pass the plumbing rough-in inspection

05Rough-in electrical

  • Plan the small appliance circuits

    Kitchen counter receptacles normally need at least two dedicated 20 amp circuits.

  • Provide GFCI protection for receptacles within 6 feet of the sink

    Most codes now require GFCI protection on all kitchen counter receptacles, and always on those near water.

  • Space counter receptacles so no point is more than 24 inches from one

    Measured along the counter, this usually means a receptacle every 4 feet.

  • Run dedicated circuits for the range, oven, dishwasher, disposal and microwave

  • Rough in the range hood circuit and its duct in the same trip

  • Plan lighting in layers

    Include ceiling lights, under cabinet task lighting, and a separately switched circuit for island pendants.

  • Set switch and receptacle heights against the finished backsplash

    Mark the finished counter and backsplash heights on the studs so no outlet lands on a tile edge.

  • Label the panel, then book and pass the electrical rough-in inspection

06Walls and ceiling

  • Insulate exterior walls and air seal every penetration

  • Photograph every open wall before drywall

    Take pictures showing pipe and wire locations and keep them with the project records.

  • Add blocking for wall cabinets, shelves and the range hood

    Screwing into blocking rather than drywall anchors is what keeps loaded upper cabinets on the wall.

  • Install a water resistant panel behind the sink wall

  • Hang, tape and sand the drywall

  • Check walls for plumb and corners for square before cabinet layout

    Out of square corners change the filler sizes, and it is cheaper to know before the cabinets arrive.

  • Prime and paint the ceiling and walls before cabinets go in

07Flooring

  • Check the subfloor for level and stiffness

    Tile needs a flat and stiff subfloor, so correct dips and add support before setting anything.

  • Decide whether the flooring runs under the cabinets

    Running the floor through simplifies future changes, and stopping at the cabinets saves material.

  • Confirm the finished floor height at every doorway and transition

  • Install the underlayment or membrane the flooring manufacturer specifies

  • Set the flooring and allow the full cure time before loading it

    Cabinets and appliances rolled over uncured tile break the bond and crack grout later.

  • Protect the finished floor during cabinet and appliance installation

  • Install thresholds and base moulding

08Cabinets and countertops

  • Check the cabinet delivery against the order list

    Inspect every box for damage and correct size on the day it arrives, while a claim is still simple.

  • Find the high point of the floor and set a level layout line

  • Install the wall cabinets before the base cabinets

  • Set the base cabinets level and shim them to the layout line

  • Confirm the counter height and overhang

    A standard counter is about 36 inches high with a 1 inch overhang past the cabinet face.

  • Template the countertop only after the base cabinets are fixed

    Stone fabricators measure the installed cabinets, not the drawings, so nothing can move afterwards.

  • Confirm the sink and cooktop cutouts on the template

    Check the cutout positions and the faucet hole count against the actual fixtures before the stone is cut.

  • Install the countertop, then seal the stone if the material needs it

  • Fit the backsplash after the countertop is in place

09Appliances and fixtures

  • Confirm the range hood airflow

    Size the hood to the cooking surface, commonly about 100 CFM per linear foot for a wall hood and more for an island hood.

  • Vent the hood to the outside with rigid duct

    Rigid metal duct with few bends keeps the rated airflow, and flexible duct reduces it.

  • Provide make-up air where the hood exceeds 400 CFM

    A large hood can depressurize a tight house, and many codes require a make-up air supply above this level.

  • Install the sink, faucet and disposal and check for leaks

  • Connect the dishwasher with a high loop or an air gap

  • Install the range, oven and refrigerator and check clearances to the cabinets

  • Run every appliance through a full cycle

    Test the oven at temperature, the dishwasher on a full wash, and the ice maker after a day.

  • Register the warranties and file the manuals with the project

10Final walkthrough

  • Walk the kitchen with the contractor and write one shared punch list

  • Open and close every door and drawer

    Check alignment, soft close operation, and that nothing rubs the neighboring door.

  • Test every outlet, switch and light, including the GFCI test buttons

  • Check under the sink and around the dishwasher for leaks after a full cycle

  • Check caulk, grout and paint touch ups in daylight

    Defects that hide under work lights are obvious in the morning, so look at the room twice.

  • Confirm all inspections passed and collect the final sign off

  • Collect lien releases, warranties and the final invoice

  • Agree a completion date for every punch list item before the final payment

    The remaining payment is the only leverage left once the crew has moved to the next job.

Who uses this checklist

  • Homeowners
  • General contractors
  • Kitchen designers
  • Remodeling crews
  • Project managers
  • Cabinet installers
  • Owners renovating remotely

Questions people ask

How long does a kitchen renovation take?
A kitchen with no structural change usually runs 6 to 10 weeks on site, plus 4 to 12 weeks beforehand for design, permits and cabinet lead time. Countertop fabrication adds 1 to 3 weeks after the cabinets are installed, because the template can only be taken once they are fixed in place.
What order should the work follow?
Demolition, then structural changes, then rough-in plumbing and electrical, then inspections, then insulation and drywall, then paint, then flooring, then cabinets, then countertop template and installation, then backsplash, then appliances and fixtures. The rough-in inspections are the gate: nothing gets closed up until they pass.
Which items are most often missed?
Blocking for the upper cabinets and the range hood, the make-up air requirement for a large hood, the refrigerator water line shutoff in a reachable position, and photographs of the open walls before drywall. All four are cheap during rough-in and expensive afterwards.
Can I use this checklist with a contractor who does not speak my language?
Yes. Items are written once in English and each person sees them in their own language, so the same list works for you, the contractor and every trade. Comments and photos are translated the same way.

Read before you start

Other templates

Pricing

$100per project

One project. One payment. Not a subscription.

Start from this template free. Activate for a one-time fee when you're ready to invite your team, start monthly reports, and keep the project for two years.

Free for everyone you invite

Start a project
Kitchen Renovation Checklist Template — MonthlyAlerts