Checklist templates · Checklist template
Bathroom Remodel checklist
A bathroom is the smallest room in a renovation and the one with the most ways to go wrong, because water, ventilation and clearances all have to be right before the tile goes on. This checklist covers the whole job with the clearances, rough-in heights and waterproofing steps written into the items. Work through it in order and the expensive mistakes get caught while they are still cheap.
01Planning and layout
Measure the room and record every existing fixture location
Confirm the toilet centerline is at least 15 inches from any wall
Codes generally require 15 inches from the centerline of the toilet to a side wall, vanity or other fixture.
Allow at least 21 inches of clear floor space in front of the toilet
Measure from the front edge of the bowl to the wall, door or vanity opposite it.
Set the shower size and check the door swing
A shower is commonly at least 30 by 30 inches inside, and the door must not strike the toilet or the vanity.
Choose the vanity, toilet, tub and shower valve before rough-in
Rough-in dimensions differ between models, so the plumber needs the actual specification sheets.
Decide on a curbed or curbless shower entry
A curbless shower needs the floor framing recessed, which has to be planned before demolition finishes.
Plan storage, towel bar and toilet paper holder positions before the walls close
Agree the written scope, allowances and schedule with the contractor
02Permits and approvals
Confirm whether the work needs plumbing, electrical or building permits
Check whether moving a toilet or a drain triggers extra review
Relocating a drain often means opening the floor structure, which is reviewed differently from a fixture swap.
Get building or association approval for any work on shared risers
Confirm the contractor license and insurance are current
Book the rough-in and final inspections into the schedule
03Demolition
Shut off and cap the water supply to the bathroom
Test for asbestos and lead before removing old tile, flooring or paint
Protect the route from the bathroom door to the exit
Remove fixtures, tile and old waterproofing down to the framing
Inspect the subfloor and framing for water damage and rot
Leaks around tubs and toilets usually only show when the finishes come off, so allow time for repair.
Confirm the joist direction before planning any new drain run
Drains cannot cut across joists freely, and this often decides where a fixture can actually go.
Remove all debris and keep the open floor dry
04Rough-in plumbing
Set the toilet flange position from the fixture rough-in dimension
Most toilets rough in at 12 inches from the finished wall, but 10 inch and 14 inch models exist.
Set the shower valve height
A shower only valve is commonly roughed in 42 to 48 inches above the finished floor, and a tub and shower valve lower at 28 to 32 inches.
Set the shower arm height
A shower arm is commonly 78 inches above the finished floor, and higher where the users are tall.
Pre-slope the shower pan toward the drain
A fall of about one quarter inch per foot moves water to the drain underneath the waterproofing.
Install the tub or shower base and support it as the manufacturer requires
Vent every trap and confirm the vent sizes
Rough in the vanity supply and drain to suit the chosen vanity
Pressure test the supply lines and fill test the drains
Do both before anything is closed, and record the result on this item.
Book and pass the plumbing rough-in inspection
05Rough-in electrical and ventilation
Provide GFCI protection for every bathroom receptacle
Run a dedicated 20 amp circuit for the bathroom receptacles
Size the exhaust fan to the room
A common rule is 1 CFM per square foot of floor area with a minimum of 50 CFM, and about 50 CFM per fixture in a larger bathroom.
Duct the fan to the outside, never into the attic
Use rigid or insulated duct on the shortest run possible, with an exterior damper so moist air leaves the building.
Keep switches and receptacles out of the shower zone
Check the local clearance rule for devices near a tub or shower opening before boxes are set.
Plan lighting at the mirror as well as on the ceiling
Lights on both sides of the mirror at about eye height remove the shadows a ceiling light creates.
Rough in heated floor wiring and the thermostat sensor if one is used
Add blocking for grab bars even if they are installed later
Blocking costs almost nothing during framing and cannot be added once the wall is tiled.
Book and pass the electrical rough-in inspection
06Waterproofing
Install cement board or a waterproof backer board in all wet areas
Apply the waterproofing as one continuous system
Follow a single manufacturer system for the pan, walls, corners and drain rather than mixing products.
Seal every corner, seam and pipe penetration
Set the shower niche between studs at a usable height
Keep the niche off the shower head wall, commonly 48 to 60 inches above the floor.
Waterproof the niche and any bench, including the top surface
Slope the niche shelf and the bench slightly toward the shower so water drains off them.
Flood test the shower pan for 24 hours before tiling
Plug the drain, fill the pan, mark the water line, and check the level and the ceiling below the next day.
Extend the waterproofing behind the tub surround to the required height
Photograph the finished waterproofing on every wall before tiling
07Tile and finishes
Check the substrate is flat before tiling
Large format tile needs a flatter surface than small tile, so correct high and low spots first.
Set out the tile layout and dry lay the pattern
Plan the cuts so full tiles land at eye level and no narrow sliver falls in a visible corner.
Confirm the slope to the drain still holds after the tile is set
Use the specified trowel and back butter large tiles
Full coverage under the tile prevents hollow spots that crack later in a wet area.
Grout, then seal the grout or stone where the manufacturer requires it
Use flexible sealant at every change of plane
Corners and the joint between wall and floor move, so they take sealant rather than grout.
Paint with a finish suited to a wet room and allow the full cure time
Install the shower door only after the tile has cured
08Fixtures and trim
Install the toilet on a new seal and check that it does not rock
Install the vanity level and fix it to the wall
Fit the vanity top, sink and faucet and seal at the wall
Mount accessories into blocking, not into tile alone
Towel bars and grab bars pulled out of tile take the tile with them.
Install the mirror, lighting and any medicine cabinet
Fit the shower trim, valve handle and shower head
Run water at every fixture and check under the vanity and around the toilet
Test the exhaust fan airflow
Hold a single sheet of tissue against the grille; it should stay in place while the fan runs.
09Final walkthrough
Run the shower for 10 minutes and check the drain and the ceiling below
A slow leak shows up on the ceiling of the room underneath before it shows anywhere else.
Check that hot and cold are on the correct sides at every fixture
Test the GFCI, every switch and the fan timer
Check for gaps in the sealant at the tub, shower base and countertop
Confirm the door clears the finished floor and closes cleanly
Confirm all inspections passed and collect the final sign off
Collect warranties, spare tile, and the paint and grout color names
Agree completion dates for the punch list items before the final payment
Who uses this checklist
- Homeowners
- General contractors
- Plumbers
- Tile setters
- Bathroom designers
- Property managers
- Owners renovating remotely
Questions people ask
- What are the standard bathroom clearances?
- The two that decide most layouts are 15 inches from the toilet centerline to any side wall or fixture, and 21 inches of clear space in front of the toilet. A shower is commonly at least 30 by 30 inches inside. Local codes vary, so confirm them with your building department before the layout is final.
- Do I really need to flood test the shower pan?
- Yes. Plugging the drain and holding water in the pan for 24 hours is the only test that proves the waterproofing works before tile hides it. A failed pan found after tiling means removing the tile, and it is the single most expensive bathroom mistake.
- What size exhaust fan does a bathroom need?
- A common rule is 1 CFM per square foot of floor area with a minimum of 50 CFM, and around 50 CFM per fixture in larger bathrooms. The duct matters as much as the fan: it must be short, rigid or insulated, and it must end outside the building rather than in the attic.
Read before you start
Renovating in Italy
Italian Kitchen and Bathroom Renovation Checklist
A phase by phase checklist for Italian kitchens and bathrooms: demolition, rough-in, screed and waterproofing, tiling, fixtures, 60cm modules, bidets, hood venting, handover.
Remodeling
How to Write a Contractor Punch List
A room-by-room method for the final walkthrough, how to describe defects so they actually get fixed, US retainage norms, and how to sign off cleanly.
Renovating in Italy
Understanding Italian Renovation Estimates
Preventivo versus computo metrico, regional unit prices, IVA rates, the exclusions that blow budgets, payment stages, and how to compare two Italian quotes fairly.
Other templates
10 phases · 76 items
Kitchen Renovation
A kitchen renovation runs through the same ten phases almost every time, and most problems come from doing one of them out of order. This checklist follows the work from the first measurements to the final walkthrough, with the dimensions and code items that are easy to miss until the walls are closed. Use it as the shared list for you, your contractor and every trade on the job.
12 phases · 93 items
Whole-House Renovation
A whole-house renovation is a dozen small projects that have to happen in the right order, and the cost of getting the order wrong grows with every phase. This checklist runs from the first budget conversation to the twelve month review, at the level of detail a homeowner and a general contractor would actually track together. It is written to be edited: keep the phases your project has and delete the rest.
7 phases · 64 items
Punch List / Final Walkthrough
A punch list only works if everyone is looking at the same list, in a room by room order, with each line written as a check that can pass or fail. This template covers the items that come up on most final walkthroughs, from the exterior to the closeout paperwork. Take it on site, mark what fails, add a photo to each failure, and assign it.